This will be my last log in 2010. We have been progressing on the parts aquisition process. Merry Christmas!!!!
Labels
- alternate solutions (1)
- background information (1)
- Calendar (1)
- design brief specs and limitations (3)
- developmental work (5)
- log (23)
- rationale (2)
- summer research (2)
- testing procedures (8)
Contributors
Thursday, December 23, 2010
Thursday, December 16, 2010
Parts Testing
Ryan van Doorn, Mattew Gannon, and myself worked in the lab to determine the usability of parts left by previous ROV teams. Many of the parts were in disrepair but salvagable. Some of the equipment will require extensive overhaul before being integrated with the ROV.
We found a large quantity of useable wiring in various gauges. We also found seven Attwood Turbo 3000 Water Resistant Blowers. Out of these only five had motors in working condition. Of those five, two had unuseable mounting cases. There were also two extra Attwood Turbo 3000 Water Resistant Blower cases without motors. We found 4 waterproof motors taken out of bilge pumps. All of these were in working order. There were four cctv cameras but without documentation we are unable to test them at this time.
We found a large quantity of useable wiring in various gauges. We also found seven Attwood Turbo 3000 Water Resistant Blowers. Out of these only five had motors in working condition. Of those five, two had unuseable mounting cases. There were also two extra Attwood Turbo 3000 Water Resistant Blower cases without motors. We found 4 waterproof motors taken out of bilge pumps. All of these were in working order. There were four cctv cameras but without documentation we are unable to test them at this time.
Wednesday, December 15, 2010
December 15, 2010
Went through leftover ROV scraps from previous years with Ryan van Doorn to find useable parts.
Friday, December 10, 2010
December 10, 2010
Found potential suppliers for parts and supplies.