Thursday, March 31, 2011

Wednesday, March 30, 2011

Wednesday, March 23, 2011

March 23, 2011

Updated the systmes engineering teachers about the work left to do.

Friday, March 18, 2011

March 18, 2011

Prepared tether wire to be connected to the system.

Tuesday, March 15, 2011

March 15, 2011

Calibrated servo rotation maximums. Integrated claw rotation servos with control system.

Friday, March 11, 2011

March 11, 2011

Connected servo motors to the control board to begin servo tests.

Tuesday, March 8, 2011

March 8, 2011

Revised claw design with the mechanical engineer.

Friday, March 4, 2011

March 4, 2011

Adjusted coding to accomodate KEvin's new servo motor.

Wednesday, March 2, 2011

March 2, 2011

Found out that the gear system for the servos had been designed backwards and had to rebuild it.

Wednesday, February 23, 2011

February 23, 2011

Constructed poster for presentation. Recieved servos and relays for ROV.

Friday, February 11, 2011

February 11, 2011

Epoxied gears to pvc axels. Started work on poster for presentation.

Thursday, February 3, 2011

February 3, 2011

Submitted revised version of plan of procedures for review.

Tuesday, January 4, 2011

Thursday, December 23, 2010

December 23, 2010

This will be my last log in 2010. We have been progressing on the parts aquisition process. Merry Christmas!!!!

Thursday, December 16, 2010

Parts Testing

Ryan van Doorn, Mattew Gannon, and myself worked in the lab to determine the usability of parts left by previous ROV teams. Many of the parts were in disrepair but salvagable. Some of the equipment will require extensive overhaul before being integrated with the ROV.

We found a large quantity of useable wiring in various gauges. We also found seven Attwood Turbo 3000 Water Resistant Blowers. Out of these only five had motors in working condition. Of those five, two had unuseable mounting cases. There were also two extra Attwood Turbo 3000 Water Resistant Blower cases without motors. We found 4 waterproof motors taken out of bilge pumps. All of these were in working order. There were four cctv cameras but without documentation we are unable to test them at this time.